Date: 10/11/2009 Views: 2726
Date: 11/06/2007 Views: 4038
Date: 04/11/2010 Views: 3082
Date: 08/23/2023 Views: 160497
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09